•  












  • Welcome to Shotcrete Systems, Inc.
    Basement Walls

    Olympic West Parking Structure - Los Angeles, CA

    Shotcrete Systems placed over 3,000cyds of Shotcrete to construct this 40' deep parking structure that stretched over 1,300 LF, with walls designed at 20" thick. The noticeable tieback blockouts were blocked out with Sta-Form and will be later filled with Shotcrete, once the decks have been installed to provide the necessary diaphragm support for the perimeter retaining walls; such that the tiebacks may then be de-tensioned safely.




    PDF Article by
    Rob Vonarb





    PDF Brochure
    Shotcrete Systems, Inc.


    Article from Structural Engineering Magazine: Hollywood, Vine, Sunset Project Spotlight

    CONTACT DIRECT:
    Rob Vonarb
    rob@shotcreteinc.com

    - Project Management/Estimating
    818-519-7468


    John Hasenfus
    john@shotcreteinc.com

    - Field Operations
    818-339-6942

    12965 San Fernando Rd.
    Sylmar, CA 91342



    copyright ©  2009 Shotcrete Systems, Inc., all rights reserved