    Shear Walls

    W Hotel - Hollywood, CA

    After being awarded the contract to construct over 4,000cyds of 4,000psi & 6,000psi Shotcrete perimeter walls and pilasters; Shotcrete Systems was able to successfully convert all 8,000psi CIP Shear walls (containing as much as 4 - rows of #18 bars) to Shotcrete. This modification provided substantial cost savings and helped to accelerate the project schedule; all the while maintaining the highest quality demands.