•  












  • Welcome to Shotcrete Systems, Inc.
    1-Sided formed Shear walls

    Terranea Resort - Palos Verdes, CA

    The utilization of Shotcrete to construct concrete shear walls is a highly effective means of reducing schedule durations and also provides significant cost savings. Shotcrete Systems was able to construct over 3,000 SF of wall per day on this project, which greatly reduced the original construction duration for these walls, while still providing the necessary structural and architectural requirements of the original CIP Concrete design. Shotcrete Systems constructed over 50,000 SF of walls on this project.




    PDF Article by
    Rob Vonarb





    PDF Brochure
    Shotcrete Systems, Inc.


    Article from Structural Engineering Magazine: Hollywood, Vine, Sunset Project Spotlight

    CONTACT DIRECT:
    Rob Vonarb
    rob@shotcreteinc.com

    - Project Management/Estimating
    818-519-7468


    John Hasenfus
    john@shotcreteinc.com

    - Field Operations
    818-339-6942

    12965 San Fernando Rd.
    Sylmar, CA 91342



    copyright ©  2009 Shotcrete Systems, Inc., all rights reserved